By the Grace of All Mighty Allah, throughout the month of October we successfully handled three shipments.

First one was the project of a “Drilling Rig”-1 unit containing 5 Packages of volume 143 Cbmand 42 MT of weight from Hyderpasa to Karachi on Vessel HR CONSTITUTION.

The second shipment was of “Drilling rig”7 units and 39 packages (accessories) of volume 1446 Cbm and 552 MT of weight from on Vessel “HAN ZHANG”.

The third one was an“Alternator” of volume 95.86 Cbm and 62.7 MT of weight from Jabel Ali to Karachi on Vessel MV AGATA M.

PROJECT 1

1 UNIT DRILLIG RIG HYDERPASA TO KARACHI

b a

PROJECT 2

7 UNITS DRILLING RIGS PORT QASIM TO TIANJIN

bb aa

PROJECT 3

1 UNIT ALTERNATOR JABEL ALI TO KARACHI

bbb aaa